Sunday 19 October 2014

Progress!

The design for the website is done with the overall look completed! The only things to do is to fill in some details and adding worthwhile content. The plan will be that this blog will be integrated into the website, and also be a portfolio for my designing endeavours. This will be up and running in the near future.



Also, this week the delivery of material to start making the second half of the workshop has arrived. With the help of dad and my older brother, we have now complete the majority of studwork. There had been problems with space as we had to move all the bits and bobs from one end of the garage to the other. We just had little space since we had the new material coming in, the area we were working on, and also the mysterious things that end up in garages.  With spaces in mind, I have also included a set-up on where major machinery and work areas could be.  This is still in the planning stage and so would love to hear feedback on some do's and don't.  At the moment, there will be worktop on the far end with sink.  Then also a Pillar drill, Table saw, Thickness plan/jointer, assembly table and maybe a lathe in the spaces behind it.  Leave comments below. :)


On a side note, I did end up knocking together a trolley to hold the small pieces of wood so we didn't have to waste time shifting it all. I bought four castors and attached them to a box I nailed together. Really not the prettiest thing to look at, but it did the job and also reduced some of the scrap wood we had lying around.  

assembly of garage and flooring

Length of garage (front to back = 11m)

Planning work area
Trolley

No comments: